03Recent work
From the job site.
Plank fit, up close
A timber-look plank being locked into place mid-install.
Cutting in the high walls
Two painters working a double-height interior in late-afternoon light.
Setting out the fence line
Aluminium rail being positioned between posts in a garden setting.
Row by row
Planks laid out and fitted across a bare slab.
Ceiling coat
Rolling a ceiling beside a masked-up window.
Measure, cut, build
Measuring timber on the stand, then fitting frame posts on site.
The crew on site
Two installers checking the next run of flooring.
Prep before paint
Sanding a patched wall ready for the next coat.
Ready to cut
An installer gearing up with ear protection before cutting.