03Recent work

From the job site.

Plank fit, up close

A timber-look plank being locked into place mid-install.

Flooring

Cutting in the high walls

Two painters working a double-height interior in late-afternoon light.

Painting

Setting out the fence line

Aluminium rail being positioned between posts in a garden setting.

Fencing

Row by row

Planks laid out and fitted across a bare slab.

Flooring

Ceiling coat

Rolling a ceiling beside a masked-up window.

Painting

Measure, cut, build

Measuring timber on the stand, then fitting frame posts on site.

Fencing

The crew on site

Two installers checking the next run of flooring.

Flooring

Prep before paint

Sanding a patched wall ready for the next coat.

Painting

Ready to cut

An installer gearing up with ear protection before cutting.

Flooring

Let's create your next project.

Get a Free Marketing Consultation